PARLIMEN MALAYSIA - OSD

Completed in 2019, the on site detention pond installed at Parlimen Malaysia functions to collect and detain stormwater from the surrounding area of Parlimen Malasia before discharging into the main drain as a method to reduce and prevent flooding.